Australian Gold and Copper ($AGC) has reported 16 metres at 2.3g/t gold, 70g/t silver, 1.4% copper and 12.2% combined lead and zinc from 112 metres in hole EGRC018 at Evergreen. Its 12 November release adds useful detail to a polymetallic discovery in New South Wales. These are downhole intervals; true widths remain unknown. Original release, pages 1 and 11.
Within that interval, six metres from 116 metres returned 5.2g/t gold, 157g/t silver, 1.0% copper and 27.9% lead plus zinc. A two-metre copper-rich interval from 123 metres returned 6.2% copper, alongside gold and silver. Both sit inside the wider 16-metre interval, so they cannot be added to it as separate extra mineralised length. Assay table, page 11.
Where the next drilling can help
EGRC018 targeted a position up-dip and more than 20 metres south of the previously reported western-zone discovery hole. The company says the western Hillston zone has now been tested across more than 220 metres of strike, with two to three interpreted lenses. The main Evergreen zone has been traced over more than 500 metres. Those are separate descriptions of the system, not automatically a continuous, uniformly graded orebody. Page 8.
Other new RC results include nine metres at 1.6g/t gold and 58g/t silver in EGRC015, and six metres at 1.4g/t gold and 53g/t silver in EGRC016. Those additional positions strengthen the case for follow-up. They do not establish that EGRC018's highest grades persist between holes. Pages 1 and 8.
The release also reports new assays from previously unsampled sections of existing diamond core. These are new exploration results, rather than repeat assays of previously tested material. Keeping that distinction avoids making old drilling sound either wholly new or merely a laboratory recheck. Pages 8–9.
The favourable reading is that the company is progressively resolving a multi-lens system through more drill positions. A smaller RC rig maintained access during wet conditions, but generally limited holes to about 150 metres. A more powerful rig, approved for the next drilling phase and scheduled later this quarter, is intended to test extensions. The deeper continuity remains a question that programme can address. Pages 8–9.
Several metals need several commercial tests
The headline grades report individual metals rather than a newly calculated copper equivalent. We would keep them that way. Adding unlike percentages and grams per tonne would not produce a saleable product, and multiplying each by today's price would not yield a mine margin.
The release's JORC table describes silver-equivalent assumptions used for Achilles, a different deposit. It says copper was excluded from that calculation because it was not recovered in the referenced metallurgy. That does not demonstrate zero recovery at Evergreen, nor does it validate transferring Achilles' other recoveries to this discovery. Evergreen needs its own representative processing evidence. JORC Table 1, aggregation methods.
The completed RC programme comprised 21 holes and 2,593 metres. Results for 18 holes have been reported, with three pending. An initial Evergreen Mineral Resource Estimate remains ahead; the stated A$5.9 million cash balance is dated 30 September, not refreshed to today's balance. Pages 1 and 9.
The grades give the next programme a clear purpose. We would judge progress by how drilling connects the lenses, how much true thickness can be established and whether a workable process can recover payable products. The next drilling and process results should make that assessment more concrete.